Project: Automated Re-Scaling of Overhead Electrical Distribution Maps
Customer: Electrical Utility
Problem: Customer needed to convert existing Overhead Electrical Distribution maps from 600’ scale for primary and 200’ scale for secondary and service to a new common 100’ scale.
Solution: Mill Creek Systems, Inc. developed a one-time und se tools to rescale the maps preserving the original aspect (look and feel).

Scaling Highlights:

  • Multi-pass scaling to scale conductor and device  text about point on associated conductor or device

  • Replace cells with new cells

  • Adjust line work to new in-line devices

  • Scaled Primary, Secondary, Transformers, Service and Streetlights

  • Perform line work cleanup, where possible

 The Overhead Map Scaling tool, developed by Mill Creek Systems, Inc., automatically scaled both the primary, secondary and service features, using a multi-stage scaling process based on the corporate graphic standards.  This preserved the original look and feel in the newly scaled maps.

Before Scaling (600', 200' Scales) Before Scaling (600', 200' Scales)

The output scaled maps, on average, required 15 minutes or less of manual touch up per section vs. 4 hours to redraw.  The savings per section were thus: 4 hours – 15 minutes = 3 hours 45 minutes per section.  For the entire project the savings were 7,700 sections x 3 hours 45 minutes/section = 28,875 hours.

After Scaling (100':1" Scale) After Scaling (100' scale)